The European Commission has approved a grant of 78 million euros for a project to expand the underground gas storage facility in Chiren, Bulgartransgaz has reported.
The project is among five approved by the EU for support under the Connecting Europe Facility. The expansion is in synergy with the LNG terminal near Alexandroupolis and other projects to improve interconnection with neighboring countries.
The goal is to increase gas storage capacity from 550 million m³ to 1 billion m³ by building 10 new production wells and 3 control wells. The daily capacity will increase from 3.82 million cubic meters to 10 million cubic meters, and the injection capacity from 3.2 million cubic meters to 8 million cubic meters.
The Bulgarian Food Bank’s Kilogram of Kindness food drive, is collecting food for the needy for the 12th consecutive time. Four to seven tons of food with a longer shelf lifeis expected to be collected – such as rice, lentils,..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common currency, the euro, both in the EU as a whole (74%) and in the euro area (81%). In Bulgaria,..
Despite the bad weather, dozens of children and their parents took part in an initiative for making toys for the Christmas decoration of the capital city. At the initiative of Sofia municipality, a workshop was put up in the square in front of..
The Democrats for a Strong Bulgaria (DSB) are to nominate the party’s leader Atanas Atanasov for president of the 51 st National Assembly...
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common..
The second edition of the Festival of Apiculture Products continues in Pleven. The exposition features honey and apiculture products, as well as honey..
+359 2 9336 661