The South Stream Transport Consortium involved in the construction of the marine section of the South Stream gas pipeline has signed an agreement with the Bulgarian ports of Burgas and Varna under which they will be used as storage facilities and logistics services during the project implementation. In its marine part, the South Stream pipeline will consist of four parallel lines along the Black Sea, as each of them will require more than 75,000 pipes.
The phantom ship VIVA 962 has changed at least 10 names and many owners before it surprisingly appeared near Cape Emine on November 1. The crew consists of a captain and a mechanic with Ukrainian passports from Kharkov, reports the "24 Chasa" portal...
More bridges over the Danube are not just a bilateral issue between Bulgaria and Romania – they are a strategic priority for the prosperity of the entire EU and for our collective security within NATO. This was emphasized by Deputy Prime Minister..
Today, the deputy PMs and ministers of transport of Bulgaria and North Macedonia Grozdan Karadjov and Aleksandar Nikoloski will sign an agreement on the preparation, construction and operation of a cross-border railway tunnel between the two..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start..
Seven-year-old Magdalena Stoyanova from art school "Kolorit" in Pleven received a gold medal and a distinction from the international..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory,..
+359 2 9336 661