Bulgaria’s National Electric Company has paid off all its debts to the US-owned thermal power plants ContourGlobal Maritza East 3 and AES Maritza East 1, it became clear from the written answer of Bulgaria’s Minister of Energy Temenuzhka Petkova to an opposition MP, BGNES agency informs. Between April 26 and May 9 the National Electric Company has paid a total of EUR 582.4 million to the two thermal power plants, Minister Petkova points out. The Bulgarian Energy Holding covered part of that sum with the loan taken from an international banking consortium. The rest of the money is paid from revenues.
During the next 24 hours, cumulus clouds will develop again over the western half of the country. At night, there will be short-term rainfalls and thunderstorms in many places. There are conditions for hail and local intense phenomena..
President Rumen Radev did not accept the Council of Ministers' proposal to lead the Bulgarian delegation to the NATO summit in Washington, the presidency said. Rumen Radev did not agree with certain provisions of the framework positions adopted..
After an accident that took place when Unit 6 of the Kozloduy NPP was shut down for repairs, no personnel were exposed to radiation, no leakage of radioactive water into the Danube River occurred, and some operators from the plant..
The hacker "Emil Kyulev", who broke the database of state institutions, banks and legal entities, was caught The Sofia City Prosecutor's Office..
There is nothing in the country’s position, approved by the Council of Ministers for the NATO summit in Washington that infringes on our national..
Bulgaria has a crucial role to play in the connectivity of several regions. It lies at a crossroads between the Balkan Peninsula, the Eastern Mediterranean..
+359 2 9336 661