Bulgarian company "Bulgartransgas" and its Romanian partner "Transgaz" have signed an addendum to a contract from April that concerns the construction of the gas interconnector under the Danube. A planned back-up gas pipeline in addition to the main pipeline, part of the Bulgaria – Romania gas interconnector, is scheduled to be completed in 214 days after opening of the construction site. The length of the pipeline will be 2.1 km and the maximum capacity of the gas link is expected to reach 1.5 billion cubic meters of gas per year.
Caretaker Premier Dimitar Glavchev said from Brussels that Ukrainian President Volodymyr Zelenskyy has shown full understanding regarding the decision not to sign the Cooperation Agreement with Ukraine without a sanction from the National Assembly...
The first political force in Parliament, GERB-SDS, met today with There Is Such a People within the frameworks of the negotiations to form a government. The participants in the meeting agreed to work on drafting a joint legislative program. A..
We Continue the Change Co-chairman Assen Vassilev called on the caretaker cabinet to urgently introduce a bill to extend the validity of the state budget for 2024. According to him, if such a bill is not adopted by the end of the year, the normal..
At its meeting today, the Bulgarian government adopted a Decision to temporarily introduce border control on the internal Bulgarian-Romanian border , as..
NATO Secretary General Mark Rutte is arriving in Bulgaria today on a visit. At the Novo Selo military training ground, he will get acquainted with the..
At night there will be high cloudiness, more significant over the southern regions. In most places the wind will weaken and die down. After midnight in..
+359 2 9336 661