Bulgaria’s cabinet adopted a resolution that the new 400 KV electric transmission network between Maritsa East substation in Bulgaria and Nea Santa substation in Greece will become an object of national significance. The European Commission defined that project as a project of common European interest. It includes the construction of 4 power grids needed for the fulfillment of the high-priority electric corridor North-South. The construction of a new inter-system power grid with a total length of 122 kilometers on Bulgarian territory and 29 kilometers on Greek territory is a key element of that project. The power grid will have a capacity of 1,500 Megawatts and will connect Maritsa East and Santa Nea substations.
During an operation of the General Directorate Combating Organised Crime under the leadership and supervision of the Sofia City Prosecutor's Office and the National Revenue Agency, a criminal group involved in tax crimes and money..
A list of over 10 unfair trade practices that must be stopped will be handed over to representatives of all parliamentary groups. Among them are high mark-ups, hidden fees of retail chains, inequality between Bulgarian and imported..
In Plovdiv, experts discuss issues of the food industry, in accordance with the most up-to-date requirements of the Bulgarian and European regulatory framework. The Union of Food Industry is the organizer of the 14th National Scientific and Practical..
BNB Governor Dimitar Radev will sign the request for an extraordinary convergence report on the fulfillment of the criteria for eurozone membership. This..
With various events throughout the country Bulgarians are marking 152 years after the death of the Apostle of Bulgarian Freedom Vasil Levski. Today, at..
Education must make children not only knowledgeable but also good people, said Minister of Education and Science Krasimir Valchev at a meeting with His..
+359 2 9336 661