Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Prime Minister Borissov inspects construction of section of transit gas pipeline to Turkey

Photo: BGNES

We have been working on one of our main priorities in the energy sector - diversification of sources and routes for supply of natural gas, Bulgarian Minister of Energy Temenuzhka Petkova said during a joint inspection with Prime Minister Boyko Borisov on the construction of the Lozenets - Nedyalsko section of the transit gas pipeline for Turkey.

The project is of key importance to the development of the existing interconnection of Bulgaria with its southern neighbor. The facility is expected to be operational in 2018. The Prime Minister pointed out that the government was also working on the interconnectors with Serbia and Greece. "We respect the European legislation and the requirements of the Third Package when implementing the projects; everyone can pay transit fees and transit through Bulgaria," Borisov said.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Festive Christmas spirit pervades the Bulgarian capital

Sofia will welcome the Christmas and New Year holidays with brilliant decorations in all areas of the city. A major highlight in the transformation of the capital will be the beautiful Christmas trees placed in key locations. The tallest among..

published on 11/24/24 9:50 AM

Sunny but chilly Sunday

Overnight it will be mostly clear. Winds will weaken and die down in many areas. In the morning it will be cold, with minimum temperatures between minus 7 and minus 2°C, reaching minus 10°C in the valleys and around minus 9°C in Sofia. Tomorrow will be..

published on 11/23/24 7:05 PM

Unit 6 of Kozloduy NPP connected to the national grid after annual maintenance

The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..

published on 11/23/24 2:09 PM