Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgaria and Greece negotiate to build new transport corridor

Photo: BTA

Bulgaria and Greece are to establish a joint company, in order to build a new transport corridor that will connect 3 Greek and 3 Bulgarian ports via a railway link. In the presence of Bulgaria’s Premier Boyko Borissov and Greece’s Prime Minister Alexis Tsipras the Ministers of Transport of the two countries Ivaylo Moscovski and Christos Spirtzis signed today a memorandum of cooperation under that project. Bulgaria and Greece will build a new railway connection between the Greek ports of Thessaloniki, Kavala and Alexandroupolis and the Bulgarian ports of Varna and Burgas on the Black Sea and Ruse on the Danube. According to Premiers Borissov and Tsipras, the future transport corridor is important for Bulgaria and Greece, as well as for the whole region. In October Bulgaria and Greece will discuss whether to include Serbia and Romania in the project. During his visit to Greece Premier Borissov also discussed with his counterpart Tsipras the forthcoming Presidency of Bulgaria of the Council of the European Union in the first half of 2018, as well as the migration crisis in Europe.





Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Weather forecast: Over the weekend temperatures will rise

On Saturday the weather will be sunny, with cumulus clouds developing in the afternoon in many parts. Temperatures will continue to rise, with minimum temperatures reaching 15-21° C., for Sofia 17° C. Daytime highs will range from 30° C., to 35° C.,..

published on 7/5/24 6:45 PM

Repair works on the Danube bridge near Ruse to be carried out without stopping traffic

The major repair works on the Danube bridge near Ruse, which will begin on 10 July, will be carried out without stopping traffic and without closing the facility, the Road Infrastructure Agency said, refuting false information published in the Romanian..

published on 7/5/24 6:13 PM

160 more workers laid off at ContourGlobal Maritsa East 3 coal-fired power plant

ContourGlobal Maritsa East 3 TPP has announced that another 160 people from the coal-fired power plant will be laid off in the coming months after the procedure for notifying the institutions and the workers has been completed, the company’s..

published on 7/5/24 4:40 PM