Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Protesters against construction of Rumyantsevo 2 hydroelectric power plant block off traffic along Sofia-Rousse main road

Photo: Plamen Hristov

Anglers and environmentalists from all over the country blocked off traffic for about an hour along the Sofia-Rousse main road. No vehicle queues or traffic jams were formed.  

They are protesting in Rumyantsevo village near Lukovit, against the draining of rivers by small hydroelectric power plants and against the construction of Rumyantsevo 2 hydroelectric power station. The protesters are carrying posters, one of which reads: “We want our rivers and our nature. No more hydroelectric power plants.”

The organizers of the protest – the associations Balkanka and Old Otters – say thatthe construction of Rumyantsevo 2 is illegal. The section of Zlatna Panega River falls within a protected area under Natura 2000. There are many species there which are under the protection of the law, but which will vanish from the river section drained by the hydroelectric power station. Its construction is inadmissible under the Danube River Basin Management Plan 2021.  The protestors are demanding that the National Construction Control Directorate conduct an inspection of the construction documents as well as the immediate stop to the plant’s construction.  

Dimitar Kumanov, member of the management council of the Balkanka association says:

“We are protesting against the illegal construction permit, issued for Rumyantsevo 2 hydroelectric power station which will inflict damages on one of the most valuable sections of Zlatna Panega River and its unique biodiversity. We demand that the National Construction Control Directorate launch an inspection of the construction authorization documents for this hydroelectric power plant. There are several violations – the weir on the river is public state property and they have no established right to use the weir and to reconstruct it – its reconstruction means building, as stipulated by the law. They do not have authorization to use a surface water construction project, which is obligatory for the issue of the above-mentioned construction permit. The court itself ruled: “This is an illegal hydroelectric power plant.”



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

General Major Nikolay Rusev

Bulgaria will seek a system for maximum protection against drones

We want to buy a system that has maximum protection against drones. This does not mean that it has a mechanical effect on the drone, but at least that it has some electromagnetic or blocking control of the device. This was explained to BNT by Maj. Gen...

published on 10/16/25 1:22 PM
Slovak President Peter Pellegrini with President of North Macedonia Gordana Siljanovska

Slovak Ambassador summoned to Ministry of Foreign Affairs over statements made in Skopje

Slovak Ambassador Vasil Grivna was summoned to the Ministry of Foreign Affairs over official statements made by Slovak President Peter Pellegrini during his visit to Skopje on October 14. There were unacceptable assessments made..

published on 10/16/25 10:40 AM

Vice President presents the most famous Chinese scholar of Bulgarian studies with an order

On behalf of the Head of State Rumen Radev, Vice President Iliana Iotova presented the Order of Sts. Cyril and Methodius, first degree, to Professor Ma Sipu, the press office of the president reported. The award was presented at..

published on 10/16/25 8:50 AM