According to approximate estimates, to construct the transport, rail and digital infrastructure in the Western Balkans will cost 30 billion euro, said Bulgarian PM Boyko Borissov at the opening of the third EBRD Western Balkans investment summit taking place in London.
The Bulgarian prime minister made this estimate and presented maps of Pan-European corridors 4,8 and 10 as well as the rail infrastructure in the region. In Borissov’s words, everything can be constructed within the next 7-8 years, provided there is a clear plan and financing from the EBRD, the Juncker plan and co-financing from the national budgets. 30 billion euro for the infrastructure in this “piece of heaven”, the Western Balkans, is not much, considering that around 50 billion was spent on the wars in the region years ago, the Bulgarian prime minister commented.
We want to buy a system that has maximum protection against drones. This does not mean that it has a mechanical effect on the drone, but at least that it has some electromagnetic or blocking control of the device. This was explained to BNT by Maj. Gen...
We want to buy a system that has maximum protection against drones. This does not mean that it has a mechanical effect on the drone, but at least that it has some electromagnetic or blocking control of the device. This was explained to BNT by Maj. Gen...
Slovak Ambassador Vasil Grivna was summoned to the Ministry of Foreign Affairs over official statements made by Slovak President Peter Pellegrini during his visit to Skopje on October 14. There were unacceptable assessments made..
Russian spies and hard-left humanitarian groups are working with people smugglers to food Europe with illegal migrants, wrote '' The Times'' , quoting..
Russia’s Deputy Minister of Foreign Affairs Alexander Grushko stated that Moscow has not held talks regarding a possible overflight of President..
Suspicions of large-scale fraud with EU funds in a project to build a mussel farm in the Black Sea – southeast of Cape Emine in the..
+359 2 9336 661