Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Gas hub feasibility study starts

Photo: BGNES

Bulgarian gas operator Bulgartransgaz and Bulgarian-Swiss consortium AF-EMG Consult have signed a contract for the feasibility study of the planned Balkan gas hub.

Within a period of 40 days the consortium will present an interim report, while a comprehensive survey will be prepared in a period of 110 days. The feasibility study will detail the commercial and technical viability of the project and will identify the exact business model for its realization, as well as target markets, demand and supply sources of natural gas.


Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Numerous violations along Bulgarian Black Sea Coast found in inspections after the deadly floods

Violations were found in 27% of the inspected sections along the Black Sea coast , according to the control authorities of the Ministry of Environment and Water. Minister Manol Genov ordered the inspection following the October floods in the southern..

published on 11/19/25 4:46 PM

President Rumen Radev again calls for a referendum on the introduction of the euro

With 128 votes in favour, the governing majority in Parliament and three independent MPs rejected the president’s veto on the Law on Defence and the Armed Forces. The amendments expand the possibilities for declaring a state of emergency and..

published on 11/19/25 1:00 PM
Zhelyazko Radukov

Bulgaria cannot be used as an excuse for the lack of reforms, says Ambassador Radukov in Skopje

In Skopje, I am hearing more and more often concerns that relations with Bulgaria are being used as a convenient excuse for the lack of will or ability to undertake the necessary reforms. I do not want to believe this argument, said Bulgaria’s..

published on 11/19/25 11:52 AM