Bulgaria and Greece signed an agreement for construction of the gas interconnector between the two countries. The project will be fulfilled by a joint venture. Bulgaria and Greece will have equal participation in the company. Initially the interconnector will have the capacity to transfer 3 billion cubic meters of gas per year. Later, it will reach its maximum capacity of 5.5 billion cubic meters. The interconnector is expected to start functioning until 2020.
By mid-December, all military units in the country will be equipped with drone control simulators, said Major General Deyan Deshkov, Commander of the Land Forces, at the Lyulyak training ground near Stara Zagora. He clarified that the drones have..
Swiss commodity trader Gunvor said it has withdrawn its proposal to buy Lukoil’s foreign assets, including the refinery in Burgas, after the U.S. Treasury called it Russia’s ‘puppet’, Reuters reported. Prime Minister: Bulgaria has a..
Bulgaria’s Premier Rosen Zhelyazkov and Ukrainie’s President Volodymyr Zelenskyy discussed energy security in the region and opportunities to strengthen cooperation in this area. The two held a phone conversation on November 6. They also discussed..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory,..
+359 2 9336 661