Representatives of the Chinese National Energy Administration (NEA) have visited the construction site of the Belene NPP to get acquainted with the equipment already supplied under the project for a second nuclear power plant in Bulgaria.
The guests were welcomed by the Executive Director of the Bulgarian NEK, Petar Iliev, who showed them the measures taken for storing the Russian equipment supplied. The construction site of the power plant is 2500 decares. Necessary roads, a train line, a port and a concrete batching plant were built. The reactor unit and the turbine hall remain to be built, the Ministry of Energy added.
A serious train crash involving a train owned by the Bulgarian company PIMK has occurred near Craiova, Romania. According to initial information, the train conductor of the private Bulgarian company, who is a Romanian citizen, died in the accident...
Sofia Airport has been officially renamed to Vasil Levski Airport at a solemn ceremony on February 19 . The ceremony was attended by Deputy Prime Minister and Minister of Transport Grozdan Karadjov, CEO of the airport operator “SOF Connect” Jesus..
Bulgarian diplomacy, without showing off, is using its influence to free the Bulgarian citizens who are hostages of Hamas in Gaza. We thanked the Bulgarian Ambassador Slavena Gergova and the EU Ambassador to Israel Dimitar Tsanchev, the Bulgarian..
The Vazrazhdane parliamentary party is organizing a protest on February 22 in front of the Bulgarian National Bank against Bulgaria's entry into the..
A serious train crash involving a train owned by the Bulgarian company PIMK has occurred near Craiova, Romania. According to initial information, the..
The agriculture sector in Bulgaria maintains its stability, providing employment to 6% of the population and forming about 4% of the country's GDP. This..
+359 2 9336 661