The National Electric Company and Russia’s nuclear power equipment and service exporter Atomstroyexport signed an agreement for storage of the nuclear equipment for Belene NPP. The whole activity related to the storage of the nuclear equipment will be done by the National Electric Company under the supervision of the manufacturers and representatives of Atomstroyexport. The contract was signed for five years with an option to be extended if necessary. However, the National Electric Company hopes that a strategic investor of the second nuclear power plant will be chosen by then and that all contracts will be transferred to that company.
We want to buy a system that has maximum protection against drones. This does not mean that it has a mechanical effect on the drone, but at least that it has some electromagnetic or blocking control of the device. This was explained to BNT by Maj. Gen...
We want to buy a system that has maximum protection against drones. This does not mean that it has a mechanical effect on the drone, but at least that it has some electromagnetic or blocking control of the device. This was explained to BNT by Maj. Gen...
Slovak Ambassador Vasil Grivna was summoned to the Ministry of Foreign Affairs over official statements made by Slovak President Peter Pellegrini during his visit to Skopje on October 14. There were unacceptable assessments made..
Suspicions of large-scale fraud with EU funds in a project to build a mussel farm in the Black Sea – southeast of Cape Emine in the..
Bulgaria, Greece and Romania have finalized a memorandum for joint cooperation on new transport projects, said European Commissioner for..
On Tuesday , the lowest temperatures will be between 2 and 7°C. In the valleys and high fields the temperature can drop to minus 2°C;..
+359 2 9336 661