The Bulgarian Electricity System Operator will invest nearly EUR 31 million in the construction of an electrical grid which will boost the electricity distribution capacity between Bulgaria and Romania. The measure is in line with the European Mechanism that promotes Policy Coherence for Development. The power line will distribute electricity from wind power plants in Northeast Bulgaria and Southeast Romania to Greece and Turkey. The Bulgarian Ministry of Energy contends that the construction of the power grid will improve the security of the power transmission system in Southeast Europe.
Restaurant owners and hoteliers, whose establishments will welcome customers on New Year's Eve, warn that they are seriously worried about how payments and revenue reporting will be handled. Until midnight, they must accept payments..
The European Commission expects Bulgaria to provide a position and assessment of the possible consequences for the Lukoil refinery in Burgas as soon as possible after the imposition of US sanctions against the Russian company. This..
Today at 11:00, in the Coat of Arms Hall of the Presidency, Vice President Iliana Iotova will officially present the collection "Alphabet. Language. Identity". The publication contains the reports from the second International Forum on the Cyrillic..
An earthquake with a 6.1 magnitude on the Richter scale hit Western Turkey at 22.48 hours last night. There were over 40 aftershocks after the..
Frol and Frosia are the newest residents of the Bear Sanctuary Belitsa, according to the Four Paws Foundation, which runs the bear sanctuary in..
Bulgaria’s draft social security budget indicates that the minimum wage from 1 January 2026 will be lower than the level set out in the Labour Code ,..
+359 2 9336 661