Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Bulgaria-Greece gas interconnector should be ready by 2020

Photo: Bulgarian Ministry of Energy

Bulgarian Energy Minister Temenuzhka Petkova and Greek Minister of Environment and Energy Giorgos Stathakis have discussed the realization of Greece-Bulgaria Gas Interconnector project. The two sides will be working on an updated timetable so that the interconnector is put into operation by 2020, in synergy with the launch of the Trans-Adriatic gas pipeline. The tender procedures for the project are expected to be completed by the end of April.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Opposition calls for occupation of parliament

"We Continue the Change" (PP) party called for a protest and blockade of the National Assembly building to stop the adoption of the budget for next year. The MPs are discussing the budget at first reading. PP received support for..

published on 11/21/25 2:04 PM

Foreign students in Bulgaria have more than doubled for 10 years

The share of foreign students in Bulgaria has more than doubled in the last decade. In 2013, they were nearly 4 percent while in 2025 their number reaches 9% of active students. This is indicated by the annual Ranking of Higher..

published on 11/21/25 1:49 PM

Bulgaria has coordinated a major international operation against antiquities trafficking

Over 3,000 antiques worth more than EUR 100 million have been seized in an international operation, coordinated from Sofia, the Greek police reported.  One of the largest antiquities smuggling networks has been dismantled with the support of Europol..

published on 11/21/25 11:01 AM