Bulgaria’s Premier Boyko Borissov and his Greek counterpart Alexis Tsipras turned the first sod of the gas interconnector Komotini-Stara Zagora. The future gas interconnector is important for the whole region and for Europe as well and will contribute to real diversification of the gas sources and the gas routes, Premier Borissov says. The 182 kilometer-long gas pipeline will be built until 2020. The project is estimated at EUR 113 million and will have the capacity to transfer between 3 and 5 billion cubic meters per year. The two premiers discussed the construction of roads and railway lines connecting the ports on the Danube River and the Black Sea with the Aegean coast. Premiers Borissov and Tsipras also discussed digital infrastructure and connectivity in the Balkans. The development of investments, tourism and transport depend on the development of our join projects, Premier Borissov added.
The overall consumer confidence index in October 2025 fell by 4 points compared to July, the National Statistical Institute has reported. In July, the indicator decreased by 4.7 points compared to April. In October, there was an..
By mid-December, all military units in the country will be equipped with drone control simulators, said Major General Deyan Deshkov, Commander of the Land Forces, at the Lyulyak training ground near Stara Zagora. He clarified that the drones have..
Swiss commodity trader Gunvor said it has withdrawn its proposal to buy Lukoil’s foreign assets, including the refinery in Burgas, after the U.S. Treasury called it Russia’s ‘puppet’, Reuters reported. Prime Minister: Bulgaria has a..
+359 2 9336 661