The extension of the Turkish Stream gas pipeline will pass through Bulgaria, not Greece, Russia’s Energy Minister Alexander Novak told journalists today at the sitting of the Russia-Turkey Intergovernmental Commission on Trade and Economic Cooperation in Antalya. The gas pipeline which has to connect Russia and Turkey via the Black Sea will start functioning on January 1, 2020. The extension which will pass through Bulgaria, Serbia and Hungary is expected to start functioning in stages. The first gas deliveries to Bulgaria are expected to be made in 2020. The pipeline will have the capacity to transfer 15.75 billion cubic meters of gas per year.
Six migrants died after the car transporting them overturned on the shore of Lake Vaya near Burgas. Before the accident, the traffickers’ car had been chased by border police between the towns of Kiten and Burgas. The driver of the car — a Romanian..
In the period November 7 to 9, Sofia Tech Park will host the tenth edition of CASSINI Hackathons & Mentoring, organized by the European Commission and the European Union Agency for the Space Programme (EUSPA). The hackathon will..
On Friday , the lowest temperatures will be between 5 and 10°C; in Sofia - it will be around 6°C. During the day it will be cloudy and with precipitation. In Northwestern Bulgaria the amounts will be significant. Almost no..
The Sofia City Court has postponed the extradition case of Igor Grechushkin, the owner of a cargo ship linked to the explosion at the port of Beirut in..
The Road Infrastructure Agency (RIA) has proposed the introduction of temporary restrictions on the movement of heavy trucks weighing over 12 tons along..
November 10 marks 36 years since the symbolic beginning of the transition from a one-party system to democracy in Bulgaria. The day..
+359 2 9336 661