The construction of the gas interconnector between Greece and Bulgaria will be completed by the end of 2020, Bulgaria’s Minister of Energy Temenuzhka Petkova specified at the Bulgarian National Assembly. The construction of this interconnector should end simultaneously with the construction of the Trans-Adriatic Pipeline. Thus, the contract between Bulgargaz and the Azerbaijani company SOCAR for the delivery of 1 billion cubic meters of gas from Shah Deniz gas field can be fulfilled, Minister Petkova added. We must complete the construction of the gas interconnector with Greece so at the end of 2020 we are able to receive these gas quantities from the Caspian region, Temenuzhka Petkova further said.
Over the next 24 hours the weather will continue cloudy, with rain mostly in the Southwestern half of the country and sleet in high plains. The precipitation over Mounts Rila and the Rhodopes will be considerable. There will be a moderate, in..
The Bulgarian Food Bank’s Kilogram of Kindness food drive, is collecting food for the needy for the 12th consecutive time. Four to seven tons of food with a longer shelf lifeis expected to be collected – such as rice, lentils,..
A Eurobarometer survey has registered the highest level of trust in the European Union since 2007 and the highest level of support ever for the common currency, the euro, both in the EU as a whole (74%) and in the euro area (81%). In Bulgaria,..
The average gross annual salary in Bulgaria in 2023 is 24,485 BGN (EUR 12,519) which is an increase of 15.3% compared to 2022, according to data from..
On Friday, cloudy weather will prevail over the country. The wind will be oriented from the northwest, will strengthen and in the Danube Plain its speed..
The due date for preventing the prospect of Borislav Sarafov taking the position of prosecutor general is drawing close, as is the deadline for..
+359 2 9336 661