A BGNES correspondent in Belgrade has reported that Serbian-registered Russian company IDC (Infrastructure Development and Construction), which was the main contractor for the construction of the TurkStream pipeline through Serbia, would be subcontracting more than 100 kilometers of the Bulgarian section of the pipeline. The relevant permission was granted by the Saudi consortium Arkad, with which Bulgarian gas operator Bulgartransgaz has a contract totaling EUR 1.1 billion. The first section of the Turkish Stream gas pipeline in Bulgaria has already been completed by a local company. The construction of the second part is expected to be completed by the next heating season.
Today, Sofia will host the fifth edition of the Global Women Leaders Forum. The event is organized by the Council of Women in Business in Bulgaria. Themed “Fast and Furious Changing World: Women in the Driving Seat”, the 2025 edition of the forum..
The average gross monthly salary in Bulgaria for July 2025 was BGN 2,570 (EUR 1,314.02), for August BGN 2,497 (EUR 1,276.7), and for September BGN 2,580 (EUR 1.319). The average monthly salary increased by 12.0% compared to the third quarter of..
Today, Bulgaria’s Head of State Rumen Radev met at the presidency building with Hungary’s Minister of Foreign Affairs and Trade Péter Szijjártó. The two discussed Europe’s prospects for addressing current challenges. Péter Szijjártó is visiting..
On Saturday, the lowest temperatures will be between 0 and 5°C; in Sofia - it will be around 0°C. During the day it will be mostly..
The Bulgarian Ministry of Defense is requesting a postponement of one of the large payments under the contract for the second F-16 to 2028. Defense..
Great Britain has issued a special license on Friday that allows businesses to continue to work with two Bulgarian subsidiaries of sanctioned Russian oil..
+359 2 9336 661