Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Scheduled repair starts of Unit 5 of Kozloduy NPP

Photo: Radio Vidin

Today, the planned annual repair of one of the two operating units of the only nuclear power plant in Bulgaria, Kozloduy NPP. This is unit number 5. During the repair period, equipment and systems will be subjected to regular maintenance operations, as well as refueling of the reactor with fresh nuclear fuel. The planned modifications related to the long-term operation of the nuclear facility will be implemented. Repairs are expected to be completed by the second half of May.

The sixth unit of Kozloduy NPP is operating at full capacity.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Lyudmila Petkova

Bulgaria risks losing 1 billion euros under the Recovery and Resilience Plan

This country may lose over a billion euros of European funding due to unadopted changes to the Recovery and Resilience Plan, the new chapter to it and the updated road map for climate neutrality, which were not accepted by the..

published on 9/28/24 12:53 PM
Council of Ministers

Bulgaria’s cabinet allocates 3.1 million euros for prevention of domestic violence

The caretaker government has adopted National Program for Prevention and Protection from Domestic Violence for the period 2024-2026 , the press service of the Council of Ministers reports. The planned measures will cost more..

published on 9/28/24 11:44 AM

Foreign Minister Kondov assures Lebanese counterpart that Bulgaria has nothing to do with pager explosions

During a short meeting on the sidelines of the UN General Assembly in New York, Bulgarian caretaker Minister of Foreign Affairs Ivan Kondov informed Minister of Foreign Affairs of Lebanon, Abdallah Bou Habib, about the results of an..

published on 9/28/24 10:50 AM