Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

First 500 meters of the longest tunnel in Bulgaria have been excavated

Photo: BGNES

The first 500 meters of the longest tunnel in Bulgaria have been excavated. It became clear during the inspection of Minister of Regional Development and Public Works Petya Avramova at Zheleznitsa Tunnel on Struma motorway. The future road infrastructure facility will consist of two separate two kilometer-long tubes for movement in each direction. The project is financed with EU money. Struma Motorway will connect Bulgaria’s capital Sofia and the Bulgaria-Greece border.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

For the first time since 1985 the demographic decline in Bulgaria has practically stopped

For the first time in 38 years the population of Bulgaria has practically stopped its downward trend. In 2023 the decline is by a mere 0.3%, or just 2,229 people, indicate data from the demographic development strategy for last year. At the end of..

published on 9/27/24 11:29 AM
Rumen Radev, briefing for Bulgarian media, New York, 26 September, 2024

President Rumen Radev meets with representatives of business companies in US

Bulgaria is growing more and more visible for businesses in the US, said Bulgaria’s President Rumen Radev at a briefing in New York after meeting with representatives of American companies. “Interacting with American companies and with..

published on 9/27/24 10:40 AM

38% of adults in Bulgaria will go to the polls in October election: Survey

If the election for parliament were to be held today, 7 political formations are certain to enter the National Assembly, indicates a poll by Trend agency, commissioned by 24 Chasa daily. GERB/SDS comes first with an approval rating of 24.8%...

published on 9/27/24 10:26 AM