In a joint analysis, the Dusseldorf Institute for Macroeconomics, the Vienna Institute for International Economic Studies WIIW and the French OFCE Institute have called on the EU to invest the billions planned for recovery from the Covid-19 crisis in two key projects.
The first is for a trans-European high-speed railway to connect all European capitals and the second for a "European Silk Road" to Moscow and the countries of the Caucasus. Both projects have key routes through Bulgaria. 853 km of "Ultra-Rapid-Train" or "Trans Europa Express" must pass through Bulgaria, and the cost of the Bulgarian section is 59% of the current GDP of the country, the analysis shows. A total of 18,250 km in the EU would cost 1,1 trillion euros.
At a national meeting convened by acting Prosecutor-General Borislav Sarafo v to discuss the rise in public and domestic violence, it was declared that the Prosecutor's Office and the Ministry of the Interior would not tolerate such crimes. "Under my..
The clashes outside the Ivan Vazov National Theatre during the opening night of John Malkovich's production of Bernard Shaw's Arms and the Man have prompted 247 theatre organisations from 39 countries to appeal to the institutions of the European Union...
President Rumen Radev announced in Dobrich the launch of the 22nd edition of the "Bulgarian Christmas" charity campaign. The theme of the campaign is "Giving Hope to a Child in Need". The aim is to raise money for high-tech equipment for early..
The financial effect of our country's accession to Schengen by land will amount to BGN 1.63 billion (EUR 833.4 million) per year, according to a study..
The Ministry of Transport and Communications supports the idea of naming Sofia Airport after Vasil Levski– the most undisputed figure in Bulgarian..
The Bulgarian Food Bank’s Kilogram of Kindness food drive, is collecting food for the needy for the 12th consecutive time. Four to seven..
+359 2 9336 661