The European Commission confirmed that a new notification on the part of Bulgaria is needed if it wants to resume the construction of Belene nuclear power plant. The motives are the changes to the project, the development of safety standards and the amendment of the legal framework of the Euratom treaty which has changed considerably and has been enhanced since 2007 when the Commission issued a favourable opinion for the construction of the nuclear power plant.
EC spokesperson Tim McPhie stated that if Bulgaria were to decide to resume the Belene project it must guarantee that it is in compliance with the Euratom treaty.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661