Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Gazprom waiting for Bulgaria to complete Balkan Stream

Photo: BTA

Turkish Stream project will be delayed by six months and according to Bulgaria’s promise, will be completed at the end of 2020, the Russian energy giant Gazprom writes in a memorandum for new euro-bond issue. The construction of the gas pipeline had to be completed in the first half of 2020, Interfax reminds.

According to the agency, Bulgaria which has not completed its section of the gas pipeline (Balkan Stream) due to the Covid-19 pandemic is the reason for the delay. This country has to build a 474 kilometer-long pipeline from the border with Turkey to the Bulgaria-Serbia border. The project is estimated at EUR 1.1 billion without VAT. Meanwhile, Bulgaria is alreay receiving gas for own consumption from Turkish Stream, Interfax claims.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Vitosha Mountain, near Sofia

Autumn rains in the Danube Plain, winds in Thrace

On Tuesday, minimum temperatures will range from 8 to 13°C , with Sofia seeing around 9°C. Rain is expected across the country, with heavier showers in north-eastern and central Bulgaria. Yellow alerts have been issued for twelve regions and orange alerts..

published on 11/10/25 7:05 PM

Road Infrastructure Agency proposes restrictions on the movement of heavy trucks on motorways during holidays

The Road Infrastructure Agency (RIA) has proposed the introduction of temporary restrictions on the movement of heavy trucks weighing over 12 tons along the country’s busiest motorways — Trakia, Hemus and Struma— during official holidays in 2026. The..

published on 11/10/25 6:05 PM

Sofia City Court postpones the extradition case of the owner of a ship linked to the explosion in Lebanon

The Sofia City Court has postponed the extradition case of Igor Grechushkin, the owner of a cargo ship linked to the explosion at the port of Beirut in 2020, which claimed the lives of more than 200 people and injured thousands. The judges requested..

published on 11/10/25 5:33 PM