The government has approved a report on the possibilities of building a new reactor on site 2 at Kozloduy NPP. The environment assessment has approved the technology of the American AP 1000 units and the Russian technologies for Belene NPP, Energy Minister Temenuzhka Petkova said. In the report, the experts support realization of Unit 7 at Kozloduy NPP with available equipment from the Belene NPP project.
"I think that after the 7thunit, we could go on to built 8th one," Prime Minister Boyko Borissov said, pointing out that the projects were in accordance with EU goals for climate neutrality by 2050 and diversification of energy resources. A model for financing of the new capacity is to be prepared, BTA reported.
The planned annual maintenance of Unit 6 of Bulgaria's only NPP, Kozloduy, has been completed. The unit was connected to the national grid at 10:07 following an inspection by the Nuclear Regulatory Agency. In addition to the repairs made to improve..
A quadripartite meeting of the interior ministers of Bulgaria, Hungary, Austria and Romania in Budapest on 22 November made it clear that Austria would lift its veto and that Bulgaria and Romania would probably become full members of Schengen from the..
President Rumen Radev met with Bulgarians living and working in Singapore during his visit to the Asian country on November 22-24. There are an estimated 400 Bulgarians living in Singapore. "Our diaspora in Singapore occupies a very special..
According to an analysis by the Electricity System Operator, a shortage of electricity is expected as early as January and February next year. At a..
“It’s time to lift internal border controls now,” European Commissioner for Home Affairs Ylva Johansson believes. In an interview with RFE/RL she..
The Constitutional Court has opened a case following the request by President Rumen Radev for the amendments to the Constitution, endorsed by the 49 th..
+359 2 9336 661