The gas interconnector between Bulgaria and Greece must be ready in 2021, stressed Bulgaria’s Premier Boyko Borissov. Premier Borissov inspected the construction works of the interconnector and noted that the project was late. The diversification of gas supplies in Bulgaria and the entire region depends on this interconnector, Boyko Borissov went on to say.
“This is full diversification, because Greece, Bulgaria and the entire region benefit from the project”, Premier Borissov said and underlined that the Gas Interconnector Greece-Bulgaria was also a European priority.
Seven-year-old Magdalena Stoyanova from art school "Kolorit" in Pleven received a gold medal and a distinction from the international children's drawing competition "Health 2025". The award ceremony took place in Sao Paulo,..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start of the Burgas Airport concession. The investment in one of the largest infrastructure projects by..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory, the government press service announced. The State Agency for National Security (SANS) entered the..
The Sofia City Court has postponed the extradition case of Igor Grechushkin, the owner of a cargo ship linked to the explosion at the port of Beirut in..
The Road Infrastructure Agency (RIA) has proposed the introduction of temporary restrictions on the movement of heavy trucks weighing over 12 tons along..
Bulgaria has sufficient quantities of fuel and the 90-day reserves are secured at around 98%, Asen Asenov, Chairman of the State Reserve and Wartime..
+359 2 9336 661