Unit 6 of Kozloduy NPP is temporarily operating at half of its capacity, the power plant has reported. The reason is the shutdown of a pump in the non-nuclear part of the unit. The necessary inspections of the equipment are being performed. The power of the unit will be increased again after it is confirmed that all systems and equipment are working normally. There is no change in the radiation situation on the site of the nuclear power plant.
The other one of Kozloduy's two operating units – Unit 5, is currently not operating because it has been undergoing regular annual repairs.
The Constitutional Court has admitted all five requests for the partial or complete annulment of the elections for the 51st National Assembly, submitted by We Continue the Change-Democratic Bulgaria (PP-DB), Vazrazhdane, There is Such a People (ITN),..
New parking lots with over 1,000 parking spaces, including special areas for people with limited mobility and electric vehicle charging stations, were opened at Sofia Airport today. The parking lots are divided into short-term and..
A Bulgarian businessman has been charged by the European Public Prosecutor's Office with attempted fraud with Chinese agricultural machinery. He tried to present the machinery as Bulgarian-made. A lawsuit has been filed in the Sofia..
According to unofficial information, the Hungarian Presidency of the Council of the EU has drafted a decision for the full admission of Bulgaria and..
The first marble statue discovered in the ancient city of Heraclea Sintica on 3 July, is probably of Lucius – grandson of Roman Emperor Octavian..
During the night, the weather will be predominantly clear and calm. There will be fog or low clouds before midday in parts of the lowlands, valleys..
+359 2 9336 661