Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Bulgarian energy regulator: Gas interconnector with Greece will not be ready until June 2022

Ivan Ivanov
Photo: BGNES

The Gas Interconnector Greece-Bulgaria through which gas should be delivered from Azerbaijan, will not be ready by the middle of 2022, said the chairman of the Bulgarian Energy and Water Regulatory Commission, Ivan Ivanov.

"We agreed on the request received from the company ICGB for extension of the term for commissioning of the interconnector from Greece's Komotini to Bulgaria's Stara Zagora until June 30, 2022. This is the foreseeable period during which the interconnector Nea Mesimvria - Siderokastro - Kulata will have to be used for alternative deliveries. And they are absolutely necessary for Bulgaria, because they can have a positive impact on consumers regarding the price of natural gas". 



The capacity for deliveries on the current interconnector is reserved only until September, Ivanov warned.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Business consumers to be compensated for high energy costs

All non-household consumers will be compensated for the high cost of electricity by the end of the year, the government has decided.  The European Commission has given the green light for the subsidy, the energy minister said. According to..

published on 9/18/24 3:06 PM

Romania launches feasibility study for the construction of a second bridge over the Danube River between Giurgiu and Ruse

The Romanian National Company for Road Infrastructure Administration (CNAIR) has announced a tender for a feasibility study for the construction of a new bridge over the Danube River between Giurgiu in Romania and Ruse in Bulgaria, reports..

published on 9/17/24 10:05 AM
The Sumitomo Electric Bordnetze factoriy in Mezdra, Bulgaria.

Japanese cable factory moves production out of Bulgaria, citing high costs

Japan's Sumitomo Electric Bordnetze plans to cease operations at one of its factories in Bulgaria, located in Mezdra, by 2025. Its second factory in Karnobat will continue to operate at reduced capacity, BTA reported. The decision comes as the company..

published on 9/15/24 5:00 PM