The trade unions from the state-owned coal-fired power station Martitsa Iztok 2 warn that they will soon initiate protest and strike action to protect the functioning of the power plant.
In an open letter they express concern over the planned transfer of the power station to the free market entirely as the cost price of the electricity it produces is too high. According to the regulatory body the power plant’s selling price is 210 Leva /107 euro/ per Mwh which is 76% higher than the household electricity price, making the electricity produced by Martitsa Iztok 2 non-marketable. The trade unions say that unless steps are taken there is a risk that Martitsa Iztok 2 power station will stop working, leading to an electricity shortage in the region.
Reporting by Juliana Kornazheva, Horizont channel, BNR.
Bulgaria’s first honorary consulate in Norway was officially inaugurated on October 24, 2025, in the city of Stavanger, the Embassy of Bulgaria in Oslo announced on Facebook. Following the performance of the national anthems of Bulgaria and..
Frol and Frosia are the newest residents of the Bear Sanctuary Belitsa, according to the Four Paws Foundation, which runs the bear sanctuary in cooperation with Foundation Brigitte Bardot. The seven-year-old Frol and Frosia come from Bear Sanctuary..
The “water meter fee” will be removed from the proposed amendments to the Water Supply and Sewerage Services Regulation Act, Minister of Regional Development and Public Works Ivan Ivanov said in an interview with bTV. According to him, the draft law..
An earthquake with a 6.1 magnitude on the Richter scale hit Western Turkey at 22.48 hours last night. There were over 40 aftershocks after the..
Bulgaria’s draft social security budget indicates that the minimum wage from 1 January 2026 will be lower than the level set out in the Labour Code ,..
On Tuesday , the lowest temperatures will be between 3 and 8°C; in Sofia – about 4°C. During the day before noon cloudiness will be..
+359 2 9336 661