Minister of the Environment and Water Asen Lichev has permitted, by letter, the Road Infrastructure Agency to present for environmental impact assessment the options for a route for a tunnel under Petrohan pass.
Minister Lichev informed the Agency that in view of the importance of the investment, the environmental impact assessment procedure will continue. On 3 June the procedure was halted because the tunnel route cuts across protected territories.
Three options for a future tunnel are being discussed, 7 or 4 kms. long. The volume of the tunnel is in question, as is whether it should be an expressway or a two-lane road. The Petrohan pass reduces the distance between Sofia, Northwestern Bulgaria and the river Danube by 46 kms. It is one of the four Bulgarian priorities under the Three Seas initiative.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661