“The accumulated problems in the sphere of energy create serious risks for the industry, for the economy and for people,” President Rumen Radev stated during a meeting with the chairman of the Energy and Water Regulatory Commission Ivan Ivanov.
Ivan Ivanov on his part pointed to the delay in the construction of the Gas Interconnector Greece – Bulgaria (IGB) which has been going on for 12 years.
“The fact that TurkStream does not branch out to any towns in Northern Bulgaria shows it is just a transit gas pipeline, built entirely at the cost of the Bulgarian side, with no clarity whether this money can be compensated for by the transit fees,” Ivan Ivanov stated further.
Ivan Ivanov and Rumen Radev agreed that the country needs a national energy strategy in view of the transition to low-carbon emissions and to protecting the people employed in the industry.
The overall consumer confidence index in October 2025 fell by 4 points compared to July, the National Statistical Institute has reported. In July, the indicator decreased by 4.7 points compared to April. In October, there was an..
By mid-December, all military units in the country will be equipped with drone control simulators, said Major General Deyan Deshkov, Commander of the Land Forces, at the Lyulyak training ground near Stara Zagora. He clarified that the drones have..
Swiss commodity trader Gunvor said it has withdrawn its proposal to buy Lukoil’s foreign assets, including the refinery in Burgas, after the U.S. Treasury called it Russia’s ‘puppet’, Reuters reported. Prime Minister: Bulgaria has a..
+359 2 9336 661