There are two dates set down in the recovery and resilience plan, adopted by the government, for the closure of the coal-fired power stations – 2038 or in 2040, caretaker Prime Minister Stefan Yanev announced.
“The mechanism of fixing these dates is yet to be finalized on the basis of technical analysis. If the date can be after 2040 – then so be it. But let’s not juggle dates around and scare people. Quite the opposite, what we want is predictability,” PM Yanev said.
“A great deal of work has gone into the document over the past 5 months. The plan was discussed with the 46th National Assembly and with the affected organizations from the industry,” Stefan Yanev added.
The plan is to be submitted to the European Commission for discussion and negotiation on 15 October.
Bulgaria’s Anti-Corruption Commission is investigating a large-scale property fraud and money laundering scheme connected to the 'Historical Park', which is associated with Ivelin Mihaylov, the leader of the Velichie party. Those arrested include the..
The ruling party and the opposition argued about the procedure for the Budget Committee meeting before the final vote on the 2006 budget . Assen Vassilev, chairman of the We Continue the Change party, attempted to block the committee’s extraordinary..
Employees in the agriculture and forestry sector staged a protest in front of the Parliament, demanding higher salaries for workers in departments that are secondary budget administrators. The protest was organized by the National Federation of..
+359 2 9336 661