The planned annual repairs of Unit VI of Kozloduy NPP have been completed five days ahead of schedule. On November 1, at 1.41 am, it joined the country's energy system after an inspection and approval by the Nuclear Regulatory Agency.
The unit was stopped on September 29. For 31 days, the capacity of 1,000 megawatts was not part of the electricity market, which caused further rise of energy prices in Bulgaria.
Equipment maintenance has been performed and the unit has been refueled with fresh nuclear fuel. All the planned activities related to increasing the safety and ensuring the long-term operation of the unit have been carried out. The 5th nuclear power unit of Kozloduy is also operating at full capacity, the power plant's head Nasko Mihov said.
Asen Grigorov, a respected and recognisable voice in Bulgarian media, has passed away after a short illness. Known for his sharp analysis and fine irony, he was one of the country’s most distinctive journalists. Born in 1966, he began his career..
The Ministry of Health is preparing a programme of home testing for colon and cervical cancer. According to BNR reporter Elena Beykova, the tests will be free and distributed by general practitioners and regional health inspectorates. The campaign is..
Prime Minister Rosen Zhelyazkov presented Pope Leo XIV with a specially crafted omophorion during an audience at the Apostolic Palace in the Vatican. This liturgical vestment symbolizes spiritual and episcopal authority, according to the Council of..
55% of Bulgarians do not feel informed about the introduction of the euro in Bulgaria, while 41% express the opposite opinion, according to a..
The Trade Union of Bulgarian Medical Specialists has declared readiness for protest actions and an effective strike, according to a statement published..
Friday will be mostly sunny. Cumulus clouds will form in the afternoon and in many places there will be short-term, temporarily intense..
+359 2 9336 661