Podcast in English
Text size
Bulgarian National Radio © 2024 All Rights Reserved

Large-scale scheme for embezzling money from Hemus Motorway project revealed

Photo: BGNES

30 million euros of the money for lot 5 of the Hemus Motorway were diverted, the General Directorate Combating Organized Crime revealed. This happens after two days ago an operation in Sofia and other cities in the country, related to the construction of the Hemus highway was held. The money was transferred to hollow companies and then withdrawn in cash. Most of these fictitious companies were registered in the name of low-income people, and some of them were criminals.

A total of 45 million euros had been allocated in advance for the construction of Lot 5, and so far there have been no actual construction activities there. The investigation revealed that several crimes had been committed in the case. The General Directorate Combating Organized Crime has received information that people who are involved in these crimes wanted to destroy documents. This necessitated a large-scale operation. A total of 17 addresses have been searched so far and 20 people have been questioned. The investigation continues.




Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgaria joins European network for cancer care

Bulgaria is joining a European consortium of national cancer centres. Speaking to BNR, Assoc. Prof. Dr. Assia Konsoulova stressed that this is the fruit of many years of effort, "because the Bulgarian patient deserves to be treated in both a cancer centre..

published on 7/8/24 5:58 PM

Code Yellow alert for hot weather issued for all Bulgarian districts on Tuesday

It will be sunny and hot on Tuesday. There will be light to moderate northerly wind. The lowest temperatures will range from 17°C to 22°C, for Sofia 17°C. Maximum temperatures will range from 34°C to 39°C, for Sofia - around 33°C. It will be..

published on 7/8/24 5:20 PM
Reactor No. 6 of the Kozloduy NPP

Kozloduy NPP’s reactor No. 6 reconnected to electricity system

Reactor No. 6 of the Kozloduy Nuclear Power Plant was reconnected to the national electricity system at 9 AM on 8 July. The reactor was disconnected on 15 June for planned preventive maintenance of the functioning of a non-nuclear transformer and a..

published on 7/8/24 11:21 AM