The Interconnector Greece-Bulgaria (IGB) has been hooked up to the Trans-Adriatic gas pipeline (TAP). The tie-in was completed with two golden welds, connecting a gas metering station at Komotini with TAP's existing infrastructure.
The successful connection of the infrastructure of the two energy projects is key to the completion of the next stage and to the commercial launch of the IGB which was planned for later this year. This was announced by the joint investment company which is building the interconnector.
IGB connects Bulgaria to the Trans-Adriatic gas pipeline which allows natural gas to be transported from Azerbaijan via Greece to Italy and the South-East European region.
Construction of the National Children's Hospital will begin in June next year , interim Prime Minister Dimitar Glavchev said at a briefing. The hospital will have 26 wards and about 400 beds . It will provide complex care for young patients. "The..
A fire broke out in the Varna office of a party which was represented in the last National Assembly and which is contesting the forthcoming elections on 27 October. The premises, located in a building in the centre of the city, were completely burnt..
Right before the two military pilots training for an air show crashed their plane in the critical seven seconds of the flight there was no communication between the tower and the plane . This is shown by the recordings of the conversations between the..
Right before the two military pilots training for an air show crashed their plane in the critical seven seconds of the flight there was no communication..
A fire broke out in the Varna office of a party which was represented in the last National Assembly and which is contesting the forthcoming elections on 27..
According to a survey by Gallup International Balkan, one tenth of respondents admit that they would accept to vote in exchange for money, other..
+359 2 9336 661