The National Electricity Company will be able to sell part of the equipment located at the construction site of the Belene NPP to Kozloduy NPP, by a decision made by the Council of Ministers at its sitting today.
The equipment in question includes filters, ventilators and other elements important to the implementation of the programmes for the extension of the lifespan of reactors 5 and 6 at Kozloduy NPP. The programmes require a supply of spare parts for repairs and new equipment for maintenance. The equipment stored at the Belene NPP site is analogical to the equipment in use at Kozloduy NPP and is interchangeable, the decision reads.
Bulgaria halted the project for a second nuclear power plant at Belene in 2013, and in 2016 the International Court of Artbitration ruled that the country should pay the Russian company Rosatom EUR 670 million for the equipment manufactured for the future nuclear power station at Belene.
Two billion euros in additional state guarantees and a concession of the Bulgarian Sports Totalizator are part of changes to the draft budget for 2026, submitted between the first and second readings. The change that increases the..
The increase in the minimum wage is supported by 54.1% of Bulgarians. 1/3 of respondents believe that the minimum wage should be equal to the living wage. This is indicated by the results of a representative survey by the Myara..
“We see a rational plan for a quick peace from President Donald Trump, according to which the situation on the battlefield is developing extremely unfavorably for Ukraine, and he is trying to prevent a worse scenario and additional casualties,”..
+359 2 9336 661