Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Bulgaria has achieved complete diversification and does not need gas from Gazprom, caretaker transport minister says

Deputy PM and Transport Minister in the caretaker cabinet Hristo Alexiev
Photo: mtc.government.bg

“We have not received the volumes of gas from Gazprom which Bulgaria is supposed to receive. At this point, after all steps taken by the caretaker government we do not need them,” Deputy Prime Minister and Minister of Transport in the caretaker cabinet Hristo Alexiev said for bTV.

“In these two months the caretaker government achieved complete diversification of gas deliveries at a very good price, and you will be able to see that in the prices for November which will be EUR 100 per MWh,” Minister Alexiev said, and added that 15 companies from Europe, USA and the Arab world have taken part in the tenders for gas.

Two contracts for the delivery of LNG will be concluded for November at very good prices. The next tender is to be announced for December, Minister Alexiev stated.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Krasimir Koev

Bulgaria enjoys top quality grape harvest

'The quality of this year's grapes is perfect, but the quantity will be lower than last year,' said Krasimir Koev, director of the Executive Agency on Vine and Wine (EAVW), at the ninth Global Conference on Wine Tourism of the UN World Tourism..

published on 10/6/25 2:46 PM

Sofia hosts the 4th Forum of Prosecutors General of the Balkan Countries

Multilateral cooperation enables the achievement of common decisions on an equal footing among participants, said Prime Minister Rosen Zhelyazkov at the opening of the 4th Forum of Prosecutors General of the Balkan Countries, held in Sofia. He added..

published on 10/6/25 12:23 PM

A new 10-kilometer section of Hemus Motorway has been opened to traffic

A new 10-kilometer section of Hemus Motorway (A2) between the Boaza and Dermantsi interchanges has been opened to traffic. Another 3 km will be opened in November. Construction also continues on sections 2 and 3 of Hemus Motorway, which span a total..

published on 10/6/25 11:41 AM