Bulgaria and Greece will soon sign a memorandum for the construction of the Alexandroupolis-Burgas oil pipeline, caretaker Minister of Energy Rosen Hristov said after the meeting with his Greek counterpart Kostas Skrekas. Rosen Hristov visited Greece where he attended the inauguration of a project for a gas-fired power plant in Alexandroupolis. The power plant, which is expected to become operational in 2026, will be able to supply Bulgaria and North Macedonia with electricity, experts said during the ceremony.
The LNG terminal in Alexandroupolis, which is under construction, will supply the power plant with natural gas. Bulgaria has a 20% stake at the LNG terminal in Alexandroupolis and booked a capacity of 1 billion cubic meters of gas per year.
President Rumen Radev did not accept the Council of Ministers' proposal to lead the Bulgarian delegation to the NATO summit in Washington, the presidency said. Rumen Radev did not agree with certain provisions of the framework positions adopted..
After an accident that took place when Unit 6 of the Kozloduy NPP was shut down for repairs, no personnel were exposed to radiation, no leakage of radioactive water into the Danube River occurred, and some operators from the plant..
PP-DB have doubted the possibility of the 50th National Assembly to produce a government. At a briefing on the sidelines of the parliament, the co-chairman of the coalition Asen Vassilev rejected the possibility of "returning the..
Ivan Ivanov, chairman of the Energy and Water Regulatory Commission, announced that a decision would be taken today on how to compensate green energy..
During the next 24 hours, cumulus clouds will develop again over the western half of the country. At night, there will be short-term..
At the European Council, Bulgaria will insist on including a text on the Republic of North Macedonia in the adoption of the conclusions of the meeting ,..
+359 2 9336 661