Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Construction of the Bulgaria-Sеrbia gas interconnector starts

Photo: me.government.bg

The construction of the Bulgaria-Serbia gas interconnector on Bulgarian territory starts on February 1, the Bulgarian presidential administration said. 

Bulgarian and Serbian Presidents Rumen Radev and Aleksandar Vucic will participate in the opening ceremony

The pipeline will have a total length of about 170 km from Novi Iskar, Bulgaria, to Nis, Serbia, of which about 62 km will be on Bulgarian territory. Its capacity will be up to 1.8 billion m3/year with reverse flow capability. The pipeline is a project of common interest to the EU, funded by the Connecting Europe Facility, the presidential office said.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Bulgarian processors import rapeseed from Canada due to a shortage of raw materials

One of the largest cargo ships in the world docked for the first time at the Port of Varna, delivering 58,000 tons of rapeseed, BGNES reported. The shipment arrived from Canada and will be refined in Bulgaria. The delivery was made due to a..

published on 4/12/25 4:04 PM

Fitch affirms Bulgaria's rating at BBB; Outlook Positive

Fitch Ratings has affirmed Bulgaria's Long-Term Foreign-Currency Issuer Default Rating (IDR) at 'BBB' with a Positive Outlook, reported BTA. ''Bulgaria's ratings are supported by its strong external and public finance balance sheets versus..

published on 4/12/25 9:36 AM

Minister Petar Dilov: VMZ-Sopot will not be privatized

There are no plans for the privatization of the Vazovski Machine-Building Plants (VMZ) in Sopot, and the information circulating in this regard is speculative, said Bulgaria’s Minister of Economy and Industry Petar Dilov at a working meeting..

published on 4/8/25 12:04 PM