Bulgaria‘s President Rumen Radev and his Serbian counterpart Aleksandar Vucic are taking part at the inaugural ceremony for the construction of the Bulgaria-Serbia Gas Interconnection (IBS) on Bulgarian territory. The interconnector linking the towns of Novi Iskar in Bulgaria and Nis in Serbia will have a total lenght of 170 kilometers, of which 62 km will be on Bulgarian territory. Its capacity will be up to 1.8 billion cubic meters of gas per year and will allow a reverse flow.
The construction of the Serbian section started one year ago and is expected to be completed in the autumn of 2023. The Bulgarian section is also expected to be completed by the end of this year. The gas interconnector is a project of common interest for the European Union and is under the Connecting Europe Facility.
"Bulgaria has proven to be a reliable transit country and even in the most difficult situation, when our country was left without Russian gas, it continued to export natural gas to Serbia smoothly," President Rumen Radev said after the meeting with his Serbian counterpart Vucic.
Overnight it will be mostly clear. Winds will decrease in many areas. Minimum temperatures will be between -5°C and 0°C, reaching -8°C in the highlands and valleys and around -7°C in Sofia. On Tuesday there will be scattered clouds , becoming..
The Ministry of Education and Science will offer religion classes in the mandatory curriculum, focusing on ethical, moral, cultural and historical competencies, Education Minister Krasimir Valchev told the Union of Bulgarian Teachers. "The introduction..
Divers, who are members of the non-profit association "Friends of the Sea - Burgas" described and marked on a map the most interesting and visited underwater sites located on the seabed along the southern part of the Bulgarian Black Sea Coast. The..
Drivers travelling today and in the coming days should prepare their vehicles for winter conditions , the Road Infrastructure Agency has urged. The..
The Ministry of the Interior has submitted 13,000 reports about poor road conditions in 2024 . This was revealed in an interview with Nova TV by Chief..
The large-scale inspection, carried out by the competent police structures of the National Police Directorate and the regional directorates of the..
+359 2 9336 661