The repair of the four aggregates of the Chaira Pumped Storage Hydro Power Plant will cost EUR 100 million.
Energy Minister Rossen Hristov visited the power plant today to discuss, with the management of the National Electricity Company, the state the facility is in, and the steps that need to be taken so it can be put back into exploitation. Two of the aggregates are in need of intermediate repair, but the other two must undergo a complete overhaul. Minister Hristov said he expected the repair work to be completed in 2025, and added that within two weeks experts from Toshiba, which was primarily involved in the construction of the facility, will visit the power plant and will give more specific opinions. The funding will not be from the state budget, with financing coming from the National Electrify Company and outside sources. In Minister Hristov’s words, the analysis of the causes of the damages to the aggregates is ongoing, with indirect losses from the emergency outage of the facility “running to millions a year.”
In connection with the state of emergency in Israel and the instructions of the Civil Defense, on Thursday, June 19 and Friday, June 20, the Consular Service at the diplomatic mission in Tel Aviv will only process urgent inquiries, mainly related to..
Bulgaria's diplomatic mission in Tehran has been evacuated. The embassy will be temporarily relocated to Baku , the capital of Azerbaijan. Prime Minister Rosen Zhelyazkov announced this to journalists in Sofia. Seventeen Bulgarians, 12 of whom..
According to Eurostat data , in 2024 Bulgaria and Estonia ranked second to last in the EU in terms of actual individual consumption (AIC) per capita . This important indicator of household material well-being is lowest in Hungary, at 72% of the..
According to data from the European Environment Agency published by the European Commission and reported by BNR correspondent in Brussels Angelina..
The village of Delchevo is restoring the tradition of celebrating Midsummer's Day with a two-day program on June 21 and 22, the Gotse..
The Maritsa East TPP complex will supply 50% of the energy for household consumers in Bulgaria. This was made clear at a briefing of..
+359 2 9336 661