The Bulgarian Nuclear Regulatory Agency has started the process for licensing the new American nuclear fuel for Unit V of the Kozloduy NPP, the agency reports. An application has already been submitted requesting a permit to use a new type of Westinghouse-produced RWFA nuclear fuel in the 1,000-megawatt Unit 5.
The agency is yet to check whether all the necessary documents have been submitted, as well as whether they meet the legal requirements.
The delivery of the first cassettes with nuclear fuel is planned for April 2024 and the first filling should take place a month later, provided that the Nuclear Regulatory Agency has issued a license, Minister of Energy Rumen Radev announced.
Sixth-grader Mira Koseva won the title of "Global Winner" at the Kangaroo Global Linguistics 2024. She placed first in level A1 and won the highest award for Bulgaria, the Ministry of Education and Culture announced. Mira studies..
In the early hours of October 19, 2024, Unit 6 of the Kozloduy NPP will be shut down for planned annual maintenance that is expected to last until the end of November. During this time, the planned repair works and recharging of the..
On Monday, October 21, repair works will start in the Romanian section of the Danube Bridge linking Ruse and Giurgiu , the Romanian authorities report. The facility will not be closed completely, BNR correspondent in Ruse, Asya..
Right before the two military pilots training for an air show crashed their plane in the critical seven seconds of the flight there was no communication..
A fire broke out in the Varna office of a party which was represented in the last National Assembly and which is contesting the forthcoming elections on 27..
According to a survey by Gallup International Balkan, one tenth of respondents admit that they would accept to vote in exchange for money, other..
+359 2 9336 661