Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.
The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule.
The poverty line for 2025 will be BGN 638 (EUR 326.2), the government has announced. It will increase by BGN 112, or by 21.3% compared to 2024. '' The new poverty line will positively impact vulnerable and low-income groups'', the government said...
400 foreign citizens who have been granted temporary protection status in Bulgaria will study at Bulgarian state universities in the new 2024/2025 academic year. The number of students was approved by a government decision. The students will be..
At the launch of the election campaign for the upcoming extraordinary parliamentary elections on October 27, caretaker Prime Minister Dimitar Glavchev reported that the efforts of the executive power to eliminate distortion of the..
The first coordination meeting with the participation of all structures involved in the contract for the acquisition of Stryker combat vehicles for the..
Bulgaria supports the United Nations' mission of having humanity's future shaped by development policies and not by military conflicts, President Rumen..
Friday will be sunny and temperatures will rise during the day to reach 28-33°C, 29°C in the capital. Lows will be between 11 and 16°C, 11°C in Sofia...
+359 2 9336 661