Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.
The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule.
The confiscation of cars driven by drunk and drugged drivers does not contradict the Bulgarian Constitution. This was decided by the Constitutional Court. The cars of those who drove after using alcohol and drugs, if they are their property,..
The Institute for Computer Science, Artificial Intelligence and Technology (INSAIT) at Sofia University "St. Kliment Ohridski" presented five scientific papers at the International Conference on Machine Learning (ICML 2025) , the university's press..
The State Agency for Refugees with the Council of Ministers will implement a pilot project for Bulgaria and the European Union aimed at creating alternative social services for unaccompanied refugee children , announced the agency’s head Ivan Ivanov,..
Demonstrations in support of Varna Mayor Blagomir Kotsev are set to intensify on Tuesday evening, expanding beyond Bulgaria to four major European cities...
“Entering the Eurozone does not present any risk to Bulgaria. Adopting the Euro can only serve as a powerful accelerator for our economic growth,”..
The REXDAN ship, which is conducting a large-scale study of the configuration and dynamics of the Danube River - from the Black Sea to Vienna , has..
+359 2 9336 661