Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Kozloduy NPP's Unit 6 switched off for scheduled annual maintenance

Photo: BGNES

Unit 6 of Kozloduy Nuclear Power Plant will be shut down for scheduled annual maintenance as of today, the NPP’s press service has announced.

The maintenance will include preventive technical maintenance and repairs of the equipment and systems to ensure the unit’s safe and reliable operation, as well as stable energy supplies during the autumn and winter period. The reactor will be reloaded with fresh fuel. The maintenance works are expected to be completed by the end of November. Unit 5 of NPP Kozloduy will operate according to the power generation schedule. 



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

Temperatures will rise at the end of the week

On Saturday, minimum temperatures will range from 13 to 19 °C . In Sofia, it will be 15 °C. Sunny weather will prevail with temporary cloud cover increasing in the afternoon. Maximum temperatures will rise to between 28 and 33 °C. In the capital, it will..

published on 7/11/25 7:25 PM

Robotic surgery factory opens in Parvomay

A global leader in the production of robotic and minimally invasive surgical equipment has officially opened a new manufacturing facility in Parvomay , Plovdiv Province, as part of its planned expansion in Europe, BNR Plovdiv reports. The American..

published on 7/11/25 4:52 PM

President requests inquiry into missed benefits in Botas contract

'It is blatantly untrue that the contract with the Turkish state-owned company Botas is not being put into use." President Rumen Radev stated this to journalists at the Krumovo Air Base. The terminal in Alexandroupolis has not been operational..

published on 7/11/25 3:51 PM