Podcast in English
Text size
Bulgarian National Radio © 2025 All Rights Reserved

Construction of Hemus motorway to be speeded up in 2024, PM Denkov says

PM Nikolai Denkov
Photo: BGNES

The financing and the construction of Hemus motorway will be speeded up in 2024, said Prime Minister Nikolai Denkov in Shumen after meeting with Shumen mayor Hristo Hristov.

“Hemus motorway will be intensified significantly next year along several lots for which there is technical preparedness. What continues to be a problem is that for Lots 7 and 8 we do not have the technical documentation yet… But everything that does have documentation, including Lot 9, will be speeded up in terms of financing and construction,” PM Denkov said, and added that in 2024 there will be financing for the preparation of projects for the construction of express roads in all directions in the Southeast – Shumen, Silistra, Ruse, Razgrad and Varna. The projects will be prepared during the year, after which construction work will begin, Nikolai Denkov stated.



Последвайте ни и в Google News Showcase, за да научите най-важното от деня!
Listen to the daily news from Bulgaria presented in "Bulgaria Today" podcast, available in Spotify.

More from category

The international naval exercise BREEZE 2025 has begun in the Black Sea

From July 7 to 20, the Bulgarian Navy is conducting the 29th edition of the national naval exercise BREEZE 2025  with international participation , the headquarters of the Bulgarian  Navy  announced. The exercise is taking place in the territorial..

published on 7/7/25 12:43 PM

BNB issues a silver commemorative coin dedicated to the 175 birth anniversary of Ivan Vazov

On July 7, the Bulgarian National Bank (BNB) puts into circulation a silver commemorative coin titled "175 Years Since the Birth of Ivan Vazov", BNB announced on its website.  The coin is part of the "Bulgarian National Revival" series. The silver..

published on 7/7/25 9:46 AM

New lane to ease truck traffic at Danube Bridge in Ruse

A new lane for heavy trucks over 12 tons will be opened at the Danube Bridge in Ruse, announced Ruse Regional Governor Dragomir Draganov. The initiative comes from the National Customs Agency, which collects the toll for crossing the facility,..

published on 7/7/25 9:18 AM