"Ukraine is still keen to buy the equipment for Bulgaria's second nuclear power plant - Belene - and is ready to pay the price we are asking," Energy Minister Rumen Radev said during an inspection of the construction of Bulgaria's gas link with Serbia.
In his words, the price will be higher than the 1.2 billion leva (about 600 million euro) set by the National Assembly. The funds received will be used for the construction of units 7 and 8 of the Kozloduy NPP with Westinghouse AP 1000 technology. The construction of the two new units will be profitable for Bulgaria, Radev said, without specifying the price.
Initially, Sofia wanted to keep part of the equipment for the needs of the two operating units of Kozloduy NPP - 5 and 6, with Russian VVER reactors.
With shouts "No to the euro", about a hundred supporters of "Vazrazhdane" gathered to protest in front of the building of the Bulgarian National Bank (BNB) in Sofia. The protest is being held over a planned official visit of the..
It is theoretically possible that Bulgaria could apply for a third payment under the Recovery and Resilience Plan by the end of 2025, European Commissioner for Economy Valdis Dombrovskis announced in an interview with the Bulgarian..
Bulgaria is to participate in the prestigious Eurovision Song Contest, which will celebrate its 70th edition in 2026. The return is part of the Bulgarian National Television’s efforts to promote Bulgarian culture and talent to an..
With the blessing of the Holy Synod of the Bulgarian Orthodox Church, a mobile application for believers has been available on the..
For a month after the start of the implementation of average speed control on 12 road sections in the country, 33,288 files with..
It is theoretically possible that Bulgaria could apply for a third payment under the Recovery and Resilience Plan by the end of 2025,..
+359 2 9336 661