"Ukraine is still keen to buy the equipment for Bulgaria's second nuclear power plant - Belene - and is ready to pay the price we are asking," Energy Minister Rumen Radev said during an inspection of the construction of Bulgaria's gas link with Serbia.
In his words, the price will be higher than the 1.2 billion leva (about 600 million euro) set by the National Assembly. The funds received will be used for the construction of units 7 and 8 of the Kozloduy NPP with Westinghouse AP 1000 technology. The construction of the two new units will be profitable for Bulgaria, Radev said, without specifying the price.
Initially, Sofia wanted to keep part of the equipment for the needs of the two operating units of Kozloduy NPP - 5 and 6, with Russian VVER reactors.
Today at 11:00, in the Coat of Arms Hall of the Presidency, Vice President Iliana Iotova will officially present the collection "Alphabet. Language. Identity". The publication contains the reports from the second International Forum on the Cyrillic..
Wednesday's minimum temperatures will be 1–6°C , with Sofia at 1°C. Some lowland areas may have reduced visibility in the morning. It will be mostly sunny during the day, with a light to moderate south-westerly wind. Maximum temperatures will reach..
Switzerland is providing financial assistance worth 21,350,000 Swiss Francs to support Bulgaria's migration policies. "As EU's external border we have the responsibility to prevent the entry of persons who may pose a security threat, and on the other..
By mid-2026, Bulgaria should be removed from the Financial Action Task Force (FATF) “grey list” of countries with deficiencies in its anti-money..
An earthquake with a 6.1 magnitude on the Richter scale hit Western Turkey at 22.48 hours last night. There were over 40 aftershocks after the..
Frol and Frosia are the newest residents of the Bear Sanctuary Belitsa, according to the Four Paws Foundation, which runs the bear sanctuary in..
+359 2 9336 661