''The price of electricity from Units 7 and 8 of the Kozloduy Nuclear Power Plant should not exceed EUR 65 per megawatt-hour, which is the average mix for electricity prices in the EU. The financial framework for the construction of Units 7 and 8 at Kozloduy NPP should not exceed 14 billion", Bulgaria’s Minister of Energy Rumen Radev said.
Minister Radev and US Assistant Secretary of Energy for International Affairs Andrew Light signed an intergovernmental agreement for cooperation on the project to build a nuclear capacity at Kozloduy NPP and for the exchange of technologies and training of specialists.The exact cost of the new units will be known by the end of March from the report prepared by the American company Westinghouse, whose reactors will be used for the future capacities. Minister Radev added that he expects the total cost of the two units to be below EUR 14 billion. The decision of the Bulgarian government is for the contract to include ''fixed deadlines and a fixed price''.
Plovdiv is hosting the 79th International Technical Fair from September 24 to 27, 2025 , bringing together leading companies, innovators, and industry professionals. The Forum highlights technological advancement and sustainable development across key..
Bulgaria has the opportunity to reap the full benefits of eurozone membership , but this will require stronger fiscal discipline, effective management of transition risks, and accelerated structural reforms , the International Monetary Fund (IMF)..
In mid-September, the traditionally great Christian feast of the Holy Cross (September 14) marks the beginning of one of the most anticipated agricultural processes – the grape harvest campaign. 2025 is no exception, but due to a number of factors, the..
+359 2 9336 661