The rehabilitated 5th unit of the Belmeken Pumped Storage Hydro Power Plant (Belmeken PSHPP) has officially been opened by Prime Minister Nikolai Denkov and Energy Minister Rumen Radev, public service TV BNT reports.
The project is worth EUR 10 million, 70% of which from the Kozloduy fund, and manager of the programme is the European Bank, Minister Radev said. The first two units were made operational in 2022, another 2 - in 2023, and the last unit is being made operational now. In the past few years the role of these facilities has surpassed the expectations of the people who built them, and pumped storage hydro power plants are now part of the flexibility of our energy system, PM Denkov stated further.
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory, the government press service announced. The State Agency for National Security (SANS) entered the..
On Saturday , the lowest temperatures will be between 7 and 12°C; in Sofia - around 8°. In the morning hours visibility will be reduced in the plains. Before noon, precipitation will temporarily stop. In the second half of the day,..
The National Assembly adopted today, at first and second reading, legislative amendments that expand the powers of the special manager of the Lukoil refinery. The texts were adopted with the votes of the parliamentary majority formations GERB-SDS,..
A 6-month reconstruction of the runway and renovation of the aprons start at Burgas Airport. November 10 marks 19 years since the start..
Seven-year-old Magdalena Stoyanova from art school "Kolorit" in Pleven received a gold medal and a distinction from the international..
Bulgaria is strengthening land, water and air security (including with a drone protection system) at Lukoil's sites on its territory,..
+359 2 9336 661