Natsionalna Elektricheska Kompania (NEK) together with Romanian company Hidroelectrica has been updating a project for a hydroelectric power plant on the Danube River, situated between Nikopol and Turnu Măgurele, Minister of Energy Rumen Radev has told journalists in the Belmeken power plant. The idea of a power plant on the Danube with the construction of a dam that would also serve as a bridge is more than half a century old, investor.bg recalls.
Hidroelectrica has two such plants together with Serbia, and the company’s experience can be applied here as well, according to NEK. The work is still at a very early stage and the supposed cost of the project is about 6 billion euros for both countries, Georgiev said.
In the past the project was frozen, as the lower level of the Romanian coast could mean flooding of large areas and small islands.
In the period January - September 2024, exports of goods from Bulgaria to the EU decreased by 3.6% compared to a year earlier and amounted to 20.895 billion euros. The main trading partners are Germany, Romania, Italy, Greece and..
Shell Exploration and Production (96) B.V , a subsidiary of Shell, will explore for oil and natural gas in Block 1-26 Khan Tervel, located in Bulgaria's exclusive economic zone in the Black Sea, announced Bulgaria's caretaker Minister of Energy..
The Bulgarian-Moldovan Chamber of Commerce and Industry held a meeting with leading specialists from the energy sector of Bulgaria and Moldova. The online conference was led by the Chairman of the Bulgarian-Moldovan Chamber of Commerce and Industry,..
+359 2 9336 661